/ 15,000ton  G/C Block Loader 

This "LIFTING LOADER" is a block lifting loader installed on the world's largest 15,000-ton Goliath crane at Sembcorp Marine in Singapore. It is used for installing super-sized offshore plant modules. By using this block loader, the detection and construction period of marine plant modules are shortened by more than 10 months, enabling faster and safer installation work.

        / 15,000TON G/C BLOCK LOADER

This "LIFTING LOADER" is a BLOCK LIFTING LOADER installed on the world's largest 15,000-ton Goliath crane at Sembcorp Marine in Singapore. It is used for installing super-sized offshore plant modules. By using this BLOCK LOADER, the detection and construction period of marine plant modules are shortened by more than 10 months, enabling faster and safer installation work.


 • Block Loader for World Largest Goliath Crane


 • Install & Load Test in the Shipyard


■ TCO-FGP DE-STACKING LIFTING PROJECT

■ TCO-FGP DE-STACKING LIFTING SOLUTION

Our HJTND has successfully executed the crude oil production TCO project using the "DE-STACKING LIFTING" device we designed.


■ 2,000TON HOOK COMBINER

The "2000ton HOOK COMBINER" project is a lifting loader used for installing modules on the world's largest ship, the Prelude FLNG (Floating Liquefied Natural Gas) facility, which was constructed until 2017. This ship has a length of 488 meters, a width of 74 meters, and a weight exceeding 600,000 tons, which is more than five times the weight of a large aircraft carrier. It used over 2.6 million tons of steel in its construction. It is one of the largest floating vessels constructed and is part of the Shell Prelude FLNG facility. HJTND successfully completed the project using the "2000ton HOOK COMBINER" designed by the company.

■ 2000TON HOOK COMBINER SOLUTION

 • LOAD TESTING

 •  MODULE LIFTING PROJECT FOR PRELUDE FLNG